UPDATE Essential Structural Maintenance Works – A78/B746 Loans 1ST – 3RD FEBRUARY- please read for full details.

26 January, 2024

 

In order to complete the below works, the following additional closures are proposed for February 2024.

Closure of the northbound A78 between Monktonhead and Meadowhead Roundabouts between 8pm Thursday 1 February and 6am Friday 2 February.

  • Northbound A78 traffic will leave at Monktonhead Roundabout and follow the A79, turning right onto the B749 Monktonhill Road and right onto Fullarton Drive, then following Golf Crescent and Harling Drive before turning right onto the A759 Dundonald Road then left onto the A759 Main Street, then taking the first exit at the A759 roundabout and proceeding to the A78 Meadowhead Roundabout.

Closure of the southbound A78 between Meadowhead and Monktonhead Roundabouts, and the southbound on slip road from Auchengate, between 8pm Friday 2 February and 6am Saturday 3 February.

  • Southbound A78 traffic will leave Meadowhead Roundabout onto the A759, following Main Street, Dundonald Road, Harling Drive and Fullarton Drive before turning left onto the B749 then A79 and proceeding to Monktonhead Roundabout.
  • Traffic for the Auchengate slip road will follow the A759 and at the roundabout follow Dundonald Road to join the above diversion.

Emergency service vehicles will not be affected – special arrangements will be in place to grant access through the works area.